A PHP Error was encountered

Severity: Warning

Message: fopen(/var/cpanel/php/sessions/ea-php74/ci_session5cf69f76c63ed21ba32fd2288356cdbf02e0a45a): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /home/karacusenergy/public_html/apps/third_party/MX/Loader.php
Line: 226
Function: _ci_load_library

File: /home/karacusenergy/public_html/apps/third_party/MX/Loader.php
Line: 245
Function: library

File: /home/karacusenergy/public_html/apps/third_party/MX/Loader.php
Line: 206
Function: libraries

File: /home/karacusenergy/public_html/apps/third_party/MX/Loader.php
Line: 64
Function: initialize

File: /home/karacusenergy/public_html/apps/core/MY_Controller.php
Line: 15
Function: __construct

File: /home/karacusenergy/public_html/apps/core/Public_Controller.php
Line: 8
Function: __construct

File: /home/karacusenergy/public_html/apps/modules/products/controllers/Products.php
Line: 6
Function: __construct

File: /home/karacusenergy/public_html/index.php
Line: 281
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /var/cpanel/php/sessions/ea-php74)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /home/karacusenergy/public_html/apps/third_party/MX/Loader.php
Line: 226
Function: _ci_load_library

File: /home/karacusenergy/public_html/apps/third_party/MX/Loader.php
Line: 245
Function: library

File: /home/karacusenergy/public_html/apps/third_party/MX/Loader.php
Line: 206
Function: libraries

File: /home/karacusenergy/public_html/apps/third_party/MX/Loader.php
Line: 64
Function: initialize

File: /home/karacusenergy/public_html/apps/core/MY_Controller.php
Line: 15
Function: __construct

File: /home/karacusenergy/public_html/apps/core/Public_Controller.php
Line: 8
Function: __construct

File: /home/karacusenergy/public_html/apps/modules/products/controllers/Products.php
Line: 6
Function: __construct

File: /home/karacusenergy/public_html/index.php
Line: 281
Function: require_once

Telecom Battery Energy Storage System Manufacturers in Delhi, Telecom BESS Suppliers in Delhi

Telecom BESS

Karacus Energy is one of the leading Telecom BESS manufacturers in India. We provide cutting-edge Telecom Battery Energy Storage System in India. As a leading player in the energy storage industry, we have harnessed our expertise and technological prowess to create this state-of-the-art solution. The Telecom BESS is specially designed to meet the unique energy storage demands of the telecom sector, ensuring uninterrupted power supply and reliable performance. Embrace the future of telecom energy storage with Karacus Energy Pvt. Ltd.'s Telecom BESS - the ultimate solution for uninterrupted power and a greener tomorrow.

Telecom Battery Energy Storage System Manufacturers in Delhi

Our team of experts has carefully developed this system to withstand the rigours of the telecom environment and deliver seamless performance. With Telecom BESS, telecom operators can optimize their energy consumption, manage peak loads efficiently, and enhance overall operational reliability. As Telecom Battery Energy Storage System Manufacturers in Delhi, we take great pride in the meticulous engineering and craftsmanship that goes into each Telecom BESS unit. 

Telecom BESS Suppliers in Delhi

The Telecom BESS from Karacus Energy Pvt. Ltd. offers scalability, flexibility, and superior performance, making it a valuable addition to any telecom infrastructure. As Telecom BESS Suppliers in Delhi, we are committed to providing top-notch products and services to our esteemed clients. By adopting our Telecom BESS, businesses can significantly reduce their carbon footprint and contribute to a more sustainable and eco-friendly telecom industry.

BESS Size 9.6KW – 144KW (upto 15 modules in parallel)
BESS Voltage 48V 15S/ 51.2V 16S
BESS Capacity 100AH - 1500AH